Core mental model
•SLOs define the reliability target; capacity planning is what makes hitting that target actually achievable under real load. They're complementary, not the same discipline.
•Plan against peak utilization, not average — a service can average low utilization while still regularly spiking well past a safe threshold during specific windows.
•Headroom exists specifically to cover the gap between a scaling trigger firing and new capacity actually serving traffic — not as generic, unmotivated padding.
•Senior-level capacity planning is about finding the minimum headroom that reliably works, not the maximum that feels safe — over-provisioning is a real, ongoing cost, not a free safety margin.
The three test types
•Load test — confirm the system holds at expected peak
•Stress test — push past expected peak deliberately to find the real breaking point
•Soak test — sustained moderate load over hours/days, the only test type that reliably catches memory leaks and slow degradation
Forecasting inputs worth combining
•Historical trend (with enough data to separate real trend from noise)
•Seasonal decomposition — separates recurring seasonal spikes from genuine underlying growth
•Known planned events, forecast explicitly rather than left to reactive autoscaling
•Business-side leading indicators (signups, active users) that predict infra demand ahead of the infra metrics themselves moving
Autoscaling tuning
•Scale up fast (avoid SLO breach during a real spike), scale down slowly (avoid thrashing — scaling in too eagerly then having to scale back out minutes later)
•Queue-depth-based scaling (KEDA and similar) is a fundamentally different, often more accurate signal than CPU/memory for queue-consuming workloads
•A scale-out event itself can cause a secondary outage (thundering herd) if new replicas all perform an expensive startup action simultaneously against a shared dependency
Stateful services need separate treatment
•Read capacity scales via replicas; write capacity in most relational databases scales vertically (a real ceiling) or via sharding (a significant project, not a capacity knob)
•Conflating read and write capacity into one number misses that they have entirely different scaling paths and lead times
Multi-region and chaos-informed planning
•A failover-capable region needs steady-state headroom for absorbing a failed region's full load, not just its own normal traffic — otherwise "designed for failover" hasn't actually been capacity-tested
•Chaos experiments that remove real capacity are the closest thing to genuinely verifying a capacity forecast, rather than trusting it as an untested assumption
Common failure modes worth remembering
•Autoscaler "reacted" on paper but new capacity wasn't actually ready in time — check real time-to-serving-traffic, not just time-to-schedule
•Load test used uniform synthetic traffic that doesn't match real bursty, unevenly-distributed production traffic
•Headroom that was correct at last review silently erodes from continued organic growth between reviews — treat capacity review as continuous, not periodic
•Longstanding over-provisioning discovered late in a cost review — the same continuous-review discipline needed to catch under-provisioning applies in the other direction too