Physical Design & Fabrication — Fundamentals
Overview walked the physical design flow end to end and extended RTL Design's timing formula across multiple paths. This page goes one level deeper into two specific steps: routing (where a wire's physical resistance and capacitance become a real, calculable delay — not the abstract "combinational delay" number used so far) and DFT/scan chains (how a chip, once manufactured, actually gets electrically tested for defects before it ships).
Analogy — Every wire on a chip is a tiny hosepipe, not an idealized instant connection. A longer, thinner hosepipe takes measurably longer for water pressure to reach the far end than a short, wide one — that lag is exactly what resistance (R, how much the pipe restricts flow) and capacitance (C, how much the pipe itself has to "fill up" before pressure propagates) do to an electrical signal on a real wire. This is why Overview's routing step matters physically, not just as a diagram step: the RC delay of an actual routed wire is a real, computable number that feeds directly into the STA critical-path calculations from Overview.
Wire Delay: From Abstract "Combinational Delay" to a Real RC Number
Annotated Example — Computing RC Delay for a Routed Wire
A routed wire connecting two cells is 2 mm long, with resistance 50 ohm/mm and capacitance 0.2 pF/mm (illustrative interconnect values, not tied to any specific fab node — actual R/C values are technology-specific and extracted from the fab's process design kit, not universal constants).
Verified computationally: 0.7 × 100 × 0.4 = 28 ps exactly. This number is small compared to the nanosecond-scale gate delays used in Overview's STA example, which is realistic for a short, well-routed wire — but the same formula scales directly with wire length (a 10x longer wire has 10x the R and 10x the C, so 100x the delay, since delay is proportional to R×C, not R or C alone). This is exactly why floorplanning (Overview) tries to keep frequently-communicating blocks physically close together: a poorly floorplanned design can force long wires between blocks, and that added RC delay eats directly into a path's timing margin — potentially turning a path that looked fine at the gate-delay level into the new critical path once real routing delay is added.
Standard Cell Libraries
DFT: Scan Chains and Post-Fabrication Testing
Annotated Example — Computing Scan Test Time
A chip's scan chain has 500 flip-flops, and the manufacturing test applies 200 test patterns at a 2 ns clock period.
Verified computationally: 1,001 cycles per pattern × 200 patterns = 200,200 total cycles, and 200,200 × 2 ns = 400,400 ns (400.4 µs). This is a simplified, non-overlapped model (real ATPG/ATE flows often overlap the shift-out of one pattern with the shift-in of the next, reducing total time) — but the core relationship holds directly: longer scan chains and more test patterns both increase test time linearly, which is exactly why real chips split one enormous scan chain into multiple shorter parallel chains — reducing shift time roughly in proportion to the number of parallel chains, at the cost of extra test I/O pins.
Try It (2 Minutes)
A different chip has a scan chain of 800 flip-flops, tested with 150 patterns at a 1.5 ns clock period.
You should land on: per pattern = 800 + 1 + 800 = 1,601 cycles; total = 1,601 × 150 = 240,150 cycles × 1.5 ns = 360,225 ns ≈ 360.2 µs. With 4 parallel chains of 200 flip-flops each, per-pattern cost drops to 200 + 1 + 200 = 401 cycles (all 4 chains shift simultaneously), giving a new total of 401 × 150 × 1.5 ns = 90,225 ns ≈ 90.2 µs — roughly a 4x reduction, directly tracking the 4x reduction in per-chain flip-flop count, which is exactly the motivation for splitting long scan chains in real designs.
The RC delay computed above is exactly the T_logic term that shows up in the formal setup and hold timing inequalities — Intermediate extends this page's timing material with clock skew, and Advanced completes the picture with the full setup/hold constraint pair, OCV derating, and useful skew.

